Injection Mold Change Efficiency
The Challenge
Operators faced challenges routing, disconnecting and reconnecting hoses during mold changes. Difficult-to-access connections and hose interference contributed to inefficient changeovers and troubleshooting.
The Solution
We evaluated the hose routing and connection system and proposed a more intuitive, plug-and-play configuration with improved routing, labeling, connections and ergonomic access.
The Results
- Up to 45 minutes of potential time savings per mold change
- Up to 1.5 hours of potential labor savings per machine per month
- More organized and clearly labeled hose routing
- Easier access for operators and technicians
The Outcome
The proposed solution provides a path toward faster, more consistent mold changeovers while reducing hose-routing challenges and simplifying technician interaction with the equipment.